Tag Archives: Design Issues

OneEleven – Post Tensioned Transfer Deck

  The high-rise building located at 111 W. Wacker Drive in downtown Chicago was formerly known as the ‘Waterview.’  The structure was originally designed as an 89-story luxury hotel located along the Chicago River.  The construction of the conventionally-reinforced building … Continue reading

Share
Posted in Design Issues, Project Updates | Tagged , | Comments Off on OneEleven – Post Tensioned Transfer Deck

Barrier Cable Systems

Barrier Strand (or Barrier Cable) is primarily used in parking structures for vehicular and/or pedestrian restraint along the ramps or perimeter.  This restraint system is different from the ‘Cable Barrier’ used along highways. Barrier Cable is comprised of a 0.5 inch … Continue reading

Share
Posted in Barrier Cable, Design Issues | Tagged , , , | Comments Off on Barrier Cable Systems