Chicago 2016 Summer Olympic Bid

Chicago is one of four candidate cities to host the 2016 Summer Olympics and Paralympics.  The final determination will be made by the International Olympics Committee on October 2, 2009 in Copenhagen, Denmark.

AMSYSCO, Inc., a regional supplier of post-tensioned concrete, supports the Chicago Olympic bid.  Should Chicago win, it is our hope that our city can construct and operate the facilities within budget.  Additionally, the safety of our citizens and guests should be priority number one.  Ultimately, we hope Chicago becomes a better city before, during and after the 2016 Olympics.

Copyright © 2009 by AMSYSCO, Inc. All rights reserved.

Share
Posted in AMSYSCO News | Tagged , | Comments Off on Chicago 2016 Summer Olympic Bid

Post Tensioned Concrete and LEED (part 1)

Several years ago, I attended a symposium headed by Mr. Rick Fedrizzi, President of the U.S. Green Building Council (http://www.usgbc.org/), regarding the LEED green building program. During the symposium, the environmental effects of construction, housing and coal powered plants were the topics of discussion. I saw a definite value for reducing our carbon footprint during the construction and occupancy phases using the “less is more” philosophy. In the past few years, I have noticed that more new construction projects have sought out a LEED certification.

While I don’t claim to be a LEED expert, I have done some basic research on the subject and how my industry, unbonded post-tensioned concrete, factors in. I believe that unbonded post-tensioned concrete can help some mid-rise and high-rise office/residential buildings received a higher LEED rating.

BUILDING HEIGHT

The potential for a reduction in the building height (and floor-to-floor height) is one key benefit that Unbonded Post-Tensioning has over Structural Steel. The Post-Tensioning Institute issued a technical bulletin which compares the savings in building height: a typical 10-story structural steel building has a height of 125’ whereas a typical 10-story post-tensioning building has a height of only 108’. The impact of the 13.6% reduction in vertical height is obvious – the quantities of all vertical elements will be reduced.

When compared to a Conventional Rebar slab, an Unbonded Post-Tensioning structure can function with thinner slabs and smaller columns. The Post-Tensioning Institute issued a technical bulletin which showed a 16% reduction in concrete with a post-tensioned residential building (excludes foundation). Also, the weight of the steel (post-tensioning tendon and rebar) inside the slabs/beams was 20% less in the post-tensioned structure versus a conventional rebar structure. Finally, the vertical height was reduced by 2% in the post-tensioned building.

With a reduced building height due to unbonded post-tensioned concrete, there are potential savings for the following:

Construction

  1. Piping for Mechanical, Electrical/ Telecom/Security, Plumbing, Fire Protection, etc.
  2. Facades with Curtainwall, Precast, Masonry, etc.
  3. Concrete Columns and Shear Walls
  4. Elevators, Metal Stairs, Construction Hoists/Cranes
  5. Reduced floor-to-floor height can reduce material for interior finishes (drywall, etc.)
  6. Reduced freight, CO2, pollution, labor, manufacturing, etc.

Operational Life-Cycle Savings

  1. The building will cast less of a shadow on the ground. This can allow grade-level vegetation to receive more sunlight. Therefore, landscaping costs and water usage for irrigation can be reduced.
  2. There will be a reduction in the energy required to vertically transport liquids (water), gases, cooled air, people, etc. Ultimately, this should reduce the energy bill for the owner(s).
  3. Quicker evacuation times in case of emergencies for tenants on the upper levels.
  4. Reduced floor-to-floor height and volume can reduce HVAC costs within units.

In future posts, I will talk about Building Weight, Quicker Construction and other LEED items.

Post Tensioned Concrete and LEED (part 2)

Post Tensioned Concrete and LEED (part 3)

– Neel Khosa, AMSYSCO Inc.

Copyright © 2009 by AMSYSCO, Inc. All rights reserved.

Share
Posted in Construction, Post Tension | Tagged , , , | Comments Off on Post Tensioned Concrete and LEED (part 1)

A look back at my start in Post Tensioning

Freshly minted with a M.S. in Structural Engineering from University of Maryland and two undergraduate degrees in Science and Civil Engineering from India, I marched into the engineering world with some confidence.  Despite a recession at the time, I landed an interview with Atlas Prestressing Corporation, a company that I knew nothing about (there were no websites those days).

In an interview with Mr. Derrick Kennedy, who eventually became my first boss, he asked me “What and how much do you know about post tensioning?”  I answered, “I know absolutely nothing about post tensioning – not even the definition.”  While my response did not surprise him, he seemed to be stunned with my candor.   Luckily, Atlas Prestressing took a chance on me and gave me my first job in the United States.

Fast forward to today.  I have had the privilege of working within the post tensioning industry for almost four decades.  28 years are with AMSYSCO, Inc. – the post-tensioning company that I started from the basement of my house with no outside financing.  To recently receive the Fellow Award from the Post Tensioning Institute is really a recognition of the many customers, engineers, suppliers and installers/ironworkers who have taught me about post-tensioning, running a business and life in general – and I’m still learning.  I also want to thank my wife and son along with many other friends and family for their kindness and support.

– Rattan Khosa, President/CEO, AMSYSCO, Inc.

Copyright © 2009 by AMSYSCO, Inc. All rights reserved.

Share
Posted in AMSYSCO News | Tagged | Comments Off on A look back at my start in Post Tensioning