Unbonded Post Tensioning – Preconstruction Checklist

The following is a preconstruction checklist for General Contractors / Construction Managers that can be used for Unbonded Post Tensioning projects.  It has saved AMSYSCO, Inc. and its Clients from costly errors, revisions, delays and problems.  These checklist(s) are not inclusive and are only meant to help post tensioned concrete projects.

Checklist – BEFORE Post Tensioning shop drawings are started

1. Does the Post Tensioning Supplier have the latest and complete set of Structural Drawings and/or Architectural elevations/floor Plans?

2. Does the Post Tensioning Supplier have the latest Post Tensioning specifications and/or Barrier Cable specifications?

3. Has the pour sequence been finalized showing pour numbers, construction joints and/or pour strips?

4. Are there any restrictions to stressing tendons due to existing buildings, shear/elevator/stair walls or space limitations?

5. Have the major slab openings been coordinated and approved by the Structural Engineer?

6. Are structural CAD Files available to save time on detailing shop drawings?

7. For residential/office buildings:  Are MEP CAD Files available for coordination with Post Tensioning drawings?

Checklist – BEFORE Post Tensioning is awarded

1. Does the jobsite have a copy of the Post Tensioning Institute’s “Field Procedures Manual for Unbonded Single Strand Tendons” (3rdEdition is current as of 2009)?

2. Does the Post Tensioning Installer have an individual who is currently certified under the Post Tensioning Institute’s “Level 2 Field Certification for Superstructure Ironworkers” program (or approved equal certification program)?  Are the other members of the installation crew certified under the Post-Tensioning Institute’s “Level 1 Field Fundamentals of Installation” program?

3. Does the Post Tensioning Inspector have an individual who is currently certified under the Post Tensioning Institute’s “Level 2 Field Certification for Inspector” program (or approved equal certification program)?

4. Is the Post Tensioning Supplier certified under the Post Tensioning Institute’s “Plant Certification” program?

5. Does the Post Tensioning Installer have an individual with experience with hydraulic stressing equipment for Post Tensioning?  This individual should have a current PTI-Certification (Level 2 Ironworker), be onsite and have a proven track record of working with stressing equipment.  Safety is priority one.

– Rattan Khosa, AMSYSCO

Copyright © 2009 by AMSYSCO, Inc. All rights reserved.

Share
Posted in Design Issues, Field Issues, Post Tension | Tagged , , , , , , , , , , | Comments Off on Unbonded Post Tensioning – Preconstruction Checklist

Real Estate – Closure of Corus Bank Chicago

Corus Bank, National Association, Chicago, Illinois, was closed today by the Office of the Comptroller of the Currency, which appointed the Federal Deposit Insurance Corporation (FDIC) as receiver.

Corus is one of the largest of the 90 banks to close. this year.  The Chicago-based bank made loans to commercial real estate projects nationally.  The downturn of the real estate market is the major reason for the bank failure.

For more information, please read the FDIC Press Release.

Share
Posted in Construction, Post Tension | Tagged , , , | Comments Off on Real Estate – Closure of Corus Bank Chicago