Pictures : Manufacturing of Unbonded Post-Tensioning

[fgallery id=1 w=450 h=385 bg=ffffff t=0 title=”Manufacturing Post Tension”]

Share
Posted in Pictures | Tagged , | Comments Off on Pictures : Manufacturing of Unbonded Post-Tensioning

Target Field article in ‘Structural Engineering & Design’ magazine

Neel Khosa and Rattan Khosa of AMSYSCO, Inc. recently contributed to an article about the use of Post-Tensioning in the Minnesota Twins Target Field. Joe Ales, Jr. from Walter P. Moore and Troy Blizzard from Mortenson Construction also contributed quotations about the design and construction of Target Field.

The abstract was published in the April 2011 issue of ‘Structural Engineering & Design’ magazine and the full article was able as a web-exclusive on GoStructural’s website.

Play Ball!!!

Artist Rendering by Populous


_________________________________________________
Copyright © 2011 by AMSYSCO, Inc. All rights reserved.

Share
Posted in Project Updates | Tagged , , , , | Comments Off on Target Field article in ‘Structural Engineering & Design’ magazine

Video: Un-extruded PC Strand

PC Strand is a high-strength steel cable used in Post-Tensioned concrete. This video shows the PC Strand prior to the plastic extrusion process (unbonded PT).


____________________________________________

Copyright © 2011 by AMSYSCO, Inc. All rights reserved.

Share
Posted in Video | Tagged , | Comments Off on Video: Un-extruded PC Strand