Category Archives: Design Issues
OneEleven – Post Tensioned Transfer Deck
The high-rise building located at 111 W. Wacker Drive in downtown Chicago was formerly known as the Waterview. The structure was originally designed as an 89-story luxury hotel located along the Chicago River. The construction of the conventionally-reinforced building … Continue reading
One Museum Park West (Case Study)
One Museum Park West (Post-Tensioning case study) from Amsysco, Inc. ____________________________________________ Copyright © 2013 by AMSYSCO, Inc. All rights reserved.
Post Tension Friction-Loss Calculations
The friction-loss calculations are important submittals for post-tensioning tendons. The calculations determine what the tendon’s final force is after short-term and long-term friction losses. The key input parameters for “Long-Term Losses” are as follows: Post-Tensioning System (Unbonded or Bonded) Type … Continue reading