Author Archives: Neel Khosa
Stressing Tendons with Short Tendon Tails
In certain situations, the tendon tail of an unbonded post-tensioning tendon may be too short to stress with the hydraulic jack. With the standard nose piece, the PT stressing operator would need around 13 inches of tendon tail (outside the … Continue reading
Infrastructure and Unbonded Post-Tensioning
“Infrastructure and Unbonded Post-Tensioning” – a presentation given during the PTI Convention on May 7, 2013. Infrastructure and Unbonded Post Tensioning from Amsysco, Inc. – Neel Khosa, Vice President ____________________________________________ Copyright © 2013 by AMSYSCO, Inc. All rights reserved.
Construction Outlook 2013
Where is the construction industry going in 2013? Up? Down? Flat? Based on the input from my network of construction professionals, 2013 should be slightly better than 2012, but still nowhere near the booming mid-2000’s. The U.S. economy shrunk in … Continue reading