Diagram of Post Tensioning Slab

Post-Tension Slab

Your typical Unbonded Post-Tensioned concrete slab will require the following items:

  1. Post-Tensioning Tendon
  2. Anchorage Devices (at stressing, intermediate, fixed ends)
  3. Reusable Pocket Formers (at stressing ends)
  4. Split Pocket Formers (at intermediate ends)
  5. Wedges (at stressing, intermediate, fixed ends)
  6. Stressing Equipment (jack, pump, gauge)

The encapsulated post-tension system requires additional corrosion-protection than the non-encapsulated post-tension system.  Contact us for more information here.

– Neel Khosa, Vice President, AMSYSCO
____________________________________________

Copyright © 2010 by AMSYSCO, Inc. All rights reserved.
Share
This entry was posted in Post Tension and tagged , , , , , . Bookmark the permalink.

Comments are closed.