Video : Pre-pour of Post-Tensioned Concrete Loading Dock

Repairs to mildly-reinforced concrete and asphalt loading dock driveway.  AMSYSCO used post-tensioned concrete in order to increase long-term durability of the concrete member.  This loading dock experiences heavy-duty loads from flatbed trucks (over 40,000 lbs) and forklift traffic. (Video from September 2014)

____________________________________________
Copyright © 2015 by AMSYSCO, Inc. All rights reserved.

Share
This entry was posted in AMSYSCO News, Field Issues and tagged , , , . Bookmark the permalink.

Comments are closed.