Yearly Archives: 2013
Stressing Tendons with Short Tendon Tails
In certain situations, the tendon tail of an unbonded post-tensioning tendon may be too short to stress with the hydraulic jack. With the standard nose piece, the PT stressing operator would need around 13 inches of tendon tail (outside the … Continue reading
2013 PTI-AMSYSCO Scholarship
AMSYSCO would like to congratulate Afsoon Nickham (Ph.D Structural & Earthquake Engineering student at the University of Buffalo) and Blake Green (M.S. Civil Engineering student at the University of Alabama-Birmingham). Both individuals were the 2013 winners of the PTI-AMSYSCO Scholarships. ____________________________________________ Copyright © 2013 … Continue reading
Infrastructure and Unbonded Post-Tensioning
“Infrastructure and Unbonded Post-Tensioning” – a presentation given during the PTI Convention on May 7, 2013. Infrastructure and Unbonded Post Tensioning from Amsysco, Inc. – Neel Khosa, Vice President ____________________________________________ Copyright © 2013 by AMSYSCO, Inc. All rights reserved.